Manufacturing Facilities


Serta Improves Lighting Quality While Reducing Energy Usage and Costs

Public Energy Solutions Brightens Production Line at New Jersey Site
spacer
Goal:

Upgrade the lighting systems at Serta, Inc.’s Linden, N.J., mattress and box spring manufacturing site, including a production area of 240,000 square feet. Serta was operating with 400 watt high-pressure sodium high bay fixtures, averaging 746,000 kilowatt hours per year.
spacer

Result:

Public Energy Solutions:
spacer

bullet

Installed T5 high output fluorescent lamps.

bullet Caused energy usage to drop 48 percent to 388,000 kilowatt hours, with expected
savings of $39,400 annually, an amount that recaptures installation costs in a little over
three years.



 


HOME | ABOUT US | SERVICES | CASE STUDIES | NEWS ROOM | LINKS | OKW | FREE ENERGY AUDIT | CONTACTS | SITE MAP
Copyright 2007 © Public Energy Solutions
This site is designed and maintained by Creative Marketing Alliance