bullet

Replace incandescent fixtures or HID or Metal Halide with lower wattage fluorescent or Metal Halide fixtures or lower wattage lighting systems.

bullet

Replace incandescent lamps with hard-wired compact fluorescent (“CFL”) and screw-in CFLs fitted with mechanical clip restraints to prevent replacement except by CFLs having the same characteristics pursuant to an agreement between Contractor and the customer.

bullet

Replace incandescent exit signs with LED exit signs or lower wattage than existing exit signs

bullet Group re-lamp standard fluorescent to energy efficiency lamps
bullet Replace existing ballasts with higher efficiency ballasts
bullet Replace fluorescent fixture with high efficiency lamp and high efficiency ballast
bullet Replace existing motors with higher efficiency motors
bullet Install thermal storage for on-peak cooling
bullet Replace electric air conditioning with more efficient units or upgrades which increase the efficiency of air conditioning units
bullet Replace electric air conditioning with gas air conditioning
bullet Replace electric air conditioning with steam air conditioning
bullet Replace existing electric water heaters with alternative fueled water heaters or with heat pump water heaters
bullet Replace electric refrigeration with more efficient units or upgrades that increase the efficiency of refrigeration units
bullet Replace electric refrigeration with gas or steam refrigeration
bullet Install clean distributed generation (“DG”) with heat recovery systems that is isolated from the Con Edison electric system (Note: Con Edison’s reliability standards applicable to DG connected to its system need not be met. However, as part of the DSM Measures Implementation Reports that Contractor must submit to Con Edison, Contractor is to obtain from customers and submit to Con Edison an acknowledgement from the customer stating that the customer understands that Con Edison will not be supplying backup service for the electric load connected to the DG and, if applicable, that the DG installation may not be designed to provide the same level of reliability as Con Edison’s system is designed to provide.)

Back to OKW page


HOME | ABOUT US | SERVICES | CASE STUDIES | NEWS ROOM | LINKS | OKW | FREE ENERGY AUDIT | CONTACTS | SITE MAP
Copyright 2007 © Public Energy Solutions
This site is designed and maintained by Creative Marketing Alliance